Advanced Equipment Corporation
Contact
Loading projects...
Advanced Equipment Corporation operable partition installations
Our Work

Project Portfolio

Our systems are installed in every geographic region of the U.S. and in a variety of applications. Our customers can be sure that our systems will stand up over time in every architectural application.

Contact UsRequest Quote

FILTER BY APPLICATION

Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714 635-5350

Systems

Manual

  • Paired Panels
  • Individual Panels
  • Image Series (Glass Walls)
  • Curved Panel Systems

Electric

  • Continuously Hinged Panels
  • Spacematic Automation
  • Vision

Applications

  • Convention Centers
  • Hospitality
  • Educational Facilities
  • Places of Worship
  • Commercial
  • Specialties

Resources

  • Projects
  • Documents & Technical Data
  • Build a Spec

Company

  • About Us
  • Get a Quote
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of Service
Filtered by:WorshipClear filters
Temple Israel
Worship

Temple Israel

Long Beach, CA

588 SF dual-system installation combining electric continuously hinged SIGMA 'C' panels on #1 track with manual paired SIGMA 'C' panels on #1 track, both featuring custom wood veneer finish and concealed SOSS hinges for pocket doors. GC: Hale Corporation. Completed 2015.

Systems Used:

Continuously Hinged PanelsPaired PanelsPassdoors & Pocket Doors
Coverage588 SF
Details →
Congregation Rodef Shalom
Worship

Congregation Rodef Shalom

San Rafael, CA

1,751 SF multi-system installation with SIGMA 'E' wood veneer and fabric panels plus ALPHA 'P' perforated acoustic panels (NRC .65). Arch: Herman Coliver Locus. Completed 2023.

Systems Used:

Paired PanelsIndividual Panels
Coverage1,751 SF
Details →