Advanced Equipment Corporation
Contact
Loading projects...
Advanced Equipment Corporation operable partition installations
Our Work

Project Portfolio

Our systems are installed in every geographic region of the U.S. and in a variety of applications. Our customers can be sure that our systems will stand up over time in every architectural application.

Contact UsRequest Quote

FILTER BY APPLICATION

Advanced Equipment Corporation

World class operable partition manufacturer since 1957. Family owned and operated.

2401 West Commonwealth Avenue, Fullerton, CA 92833

714 635-5350

Systems

Manual

  • Paired Panels
  • Individual Panels
  • Image Series (Glass Walls)
  • Curved Panel Systems

Electric

  • Continuously Hinged Panels
  • Spacematic Automation
  • Vision

Applications

  • Convention Centers
  • Hospitality
  • Educational Facilities
  • Places of Worship
  • Commercial
  • Specialties

Resources

  • Projects
  • Documents & Technical Data
  • Build a Spec

Company

  • About Us
  • Get a Quote
  • Contact

© 2026 Advanced Equipment Corporation. All rights reserved.

Privacy PolicyTerms of Service
Filtered by:HospitalityClear filters
The Nile Ritz-Carlton
Hospitality

The Nile Ritz-Carlton

Cairo, Eqypt

Systems Used:

Individual Panels
Coverage9807
Details →
Cairo Marriott
Hospitality

Cairo Marriott

Cairo, Eqypt

Electrically operated partitions with custom veneer finishes, elegantly divide ballrooms at the Cairo Marriott Hotel.

Systems Used:

Continuously Hinged Panels
Coverage925
Details →
JW Marriott Ilhilani
Hospitality

JW Marriott Ilhilani

Oahu, HI

9,195 SF dual-system installation combining manual ALPHA 'S' panels with vinyl finish on #1 track and IMAGE 'J' glass panels with trynemic frame finish on #1A track. Premier resort pavilion providing flexible event and meeting space with ocean views. Arch: Kollin Altomare. GC: Airwall Technicians. Completed 2009.

Systems Used:

Image Series (Glass Walls)Paired PanelsIndividual Panels
Coverage9,195 SF
Details →
Daniel's Broiler
Hospitality

Daniel's Broiler

Bellevue, WA

334 SF manual ALPHA 'S' individual panel system on #1 and #3 tracks with custom wood clad and mirror finish for upscale private dining. Arch: Mesher Shing McNutt. Completed 2013.

Systems Used:

Individual Panels
Coverage334 SF
Details →
Hyatt Regency Lake Washington
Hospitality

Hyatt Regency Lake Washington

Renton, WA

Premium hospitality operable partition system across 8,713 SF at the Hyatt Regency Lake Washington, featuring custom walnut wood-veneer and AEC Standard fabric finishes. Completed 2017.

Systems Used:

Individual PanelsPaired Panels
Coverage8,713 SF
Details →
Hilton Botanika Osa Peninsula
Hospitality

Hilton Botanika Osa Peninsula

Osa Peninsula, Costa Rica

SIGMA 'D' manual paired operable partitions on #2 track with standard vinyl finish at the Hilton Botanika Curio Collection. Arch: Arq. Andrea Sotomayor. GC: Prodeyco. Completed 2022.

Systems Used:

Paired Panels
Details →
Hotel W Reserva Conchal
Hospitality

Hotel W Reserva Conchal

Guanacaste, Costa Rica

462 SF manual paired ALPHA 'S' panel system on #2 track with custom fabric finish. Premium resort conference and event space. Completed 2018.

Systems Used:

Paired Panels
Coverage462 SF
Details →